When GazMetro, the largest natural gas distributor in Quebec, planned a 9.3 mile pipeline expansion to bring gas from the Trans Quebec and Maritimes transmission system on the north shore of the St. Lawrence River at Trois-Rivieres, to the Industrial Park of Becancour to the south, they knew it was going to be a challenge. This expansion was driven by the need to build redundancy into the system, to address the fact that the exiting 10-inch diameter crossing was operating at capacity and to meet commitments to supply a 550 MW co-generation plant at the Becancour Industrial Park. The major portion of this project was clearly going to be crossing the St. Lawrence River with a 20-inch diameter pipe for a distance of 7,600 feet, a task never before accomplished using horizontal directional drilling.
机译:魁北克最大的天然气分销商GazMetro计划进行9.3英里的管道扩展,以将来自Trois-Rivieres的St. Lawrence河北岸的Trans Quebec和Maritimes传输系统的天然气输送到Becancour工业园,直至在南方,他们知道这将是一个挑战。这种扩展是由于需要在系统中建立冗余,以解决现有的10英寸直径交叉口正在满负荷运行的事实,并满足在Becancour工业园提供550 MW热电联产电厂的承诺。显然,该项目的主要部分将是用直径20英寸的管道穿越圣劳伦斯河,行程达7,600英尺,这是使用水平定向钻井从未完成的任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号