The project was completed ahead of schedule by mid-summer 2017. The bypass was removed, and the lines were back in service shortly thereafter. The success of this project was predicated on the ability to manage risk associated with providing the appropriate rehabilitation method, along with sufficient installation access while mitigating impact in a difficult golf course location. The project is a prime example of the benefits that can be realized, even on difficult projects, when the owner, engineer and contractor work together throughout all phases.
机译:该项目于2017年夏中提前完成。旁路被拆除,管线不久后重新投入使用。该项目的成功取决于能否管理与提供适当的修复方法相关的风险,以及足够的安装通道,同时减轻在困难的高尔夫球场中的撞击。该项目是业主,工程师和承包商在所有阶段通力合作时,即使在困难项目中也能实现的最大收益。

著录项

  • 来源
    《Underground Construction》 |2019年第7期|32-33|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号