首页> 外文期刊>Warships Forecast >Analysis 4: The Market for Aircraft Carriers and Amphibious Warfare Ships 2021-2030
【24h】

Analysis 4: The Market for Aircraft Carriers and Amphibious Warfare Ships 2021-2030

机译:分析4:航空器运营商市场和两栖战争船舶2021-2030

获取原文
获取原文并翻译 | 示例
           

摘要

Naval shipyards were severely impacted by COVID-19. During the initial wave of the pandemic, a number of shipyards came to a near grinding halt due to the large number of workers affected by the virus. The situation became so dire in the United States that the U.S. Navy activated over 1,600 reservists to fill in for the out-sick workers under what has been called the U.S. Navy's Surge Maintenance program. But while a vast number of ship construction schedules have been delayed, the pandemic has had relatively little negative impact on aircraft carrier and amphibious assault ship construction because of the lengthy time required to build such ships in comparison to, say, a frigate.
机译:海军造船厂因Covid-19严重影响。 在大流行的初始浪潮中,由于受病毒影响的大量工人,许多造船厂暂停了近距离停止。 在美国的情况变得如此,美国海军在1,600多家存款人中激活,以填补所谓的外国浪涌维修计划的出生工人。 但是,虽然大量船舶施工时间表被推迟,但大流行对航空母舰和两栖攻击船舶建设的负面影响相对较少,因为与如前卫的船舶建立此类船只所需的漫长时间,而且说是一个暴力。

著录项

  • 来源
    《Warships Forecast》 |2021年第7期|16.1-16.15|共15页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号