...
首页> 外文期刊>Waste and water management in Australia >Melbourne-Geelong pipeline activated
【24h】

Melbourne-Geelong pipeline activated

机译:墨尔本-吉朗管道启动

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Melbourne to Geelong pipeline, a water security measure built by Victoria's previous Labor government, has been switched on for the first time. Water from the Melbourne system is flowing into Barwon Water's Lovely Banks basins. Extremely dry conditions across Barwon Water's service region have seen storages drop to levels not seen since the millennium drought, prompting the water corporation to place an order for six gigalitres of water from the Thomson/Yarra catchment.
机译:由维多利亚州前工党政府建立的墨尔本至吉朗的输水管道是一项水安全措施,首次启用。来自墨尔本系统的水流入Barwon Water的Lovely Banks盆地。整个Barwon Water服务区域的极端干燥条件使储水量下降到自千年干旱以来的最低水平,促使自来水公司向Thomson / Yarra流域订购了6吉水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号