...
首页> 外文期刊>Water Policy >Opportunities and barriers in scaling up of 24/7 urban water supply: the case of Karnataka, India
【24h】

Opportunities and barriers in scaling up of 24/7 urban water supply: the case of Karnataka, India

机译:扩大24/7城市供水的机会和障碍:印度卡纳塔克邦的案例

获取原文
获取原文并翻译 | 示例
           

摘要

Scaling up pilot projects providing continuous water supply to households in Indian cities has proved challenging. This study identifies opportunities and barriers in scaling up, in order to derive recommendations for bridging the gap between testing policy innovations and bringing projects to scale. We analyse pilot design, required resources, and drivers of stakeholders, institutions and the environment for a case study in Karnataka and find a wide range of factors that affect adoption of 24/7 water supply. Upscaling should be tailor-made for each area, which requires space, scope and capacity to be created for local involvement.
机译:事实证明,扩大试点项目为印度城市的家庭提供持续供水是一项挑战。这项研究确定了扩大规模的机会和障碍,以便为缩小测试政策创新与扩大项目规模之间的差距而提出建议。在卡纳塔克邦的案例研究中,我们分析了试点设计,所需资源以及利益相关者,机构和环境的驱动因素,并发现了影响采用24/7供水的多种因素。升级应该针对每个区域量身定制,这需要空间,范围和能力以供本地参与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号