首页> 外文期刊>Water21 >Second phase for Australian ecosystems project
【24h】

Second phase for Australian ecosystems project

机译:澳大利亚生态系统项目第二阶段

获取原文
获取原文并翻译 | 示例
           

摘要

Consultancy Sinclair Knight Merz has been appointed by Australia's National Water Commission (NWC), to develop Phase 2 of the Atlas for Groundwater Dependent Ecosystems (GDEs) project. This project addresses the lack of a systematic record of the location and characteristics of GDEs across Australia. The development of the Atlas, which is expected to be completed by May 2012, is a significant first step in collating all known information regarding GDEs, as well as developing significant new GDE knowledge, says the company, and will be used as a primary reference for GDE information in the future. 'The ultimate aim of the GDE Atlas is to facilitate the inclusion of environmental groundwater use in the water planning and allocation process,' explains Alex Paton, Manager, Capability Marketing at SKM.
机译:咨询顾问辛克莱·奈特·梅尔兹(Sinclair Knight Merz)已被澳大利亚国家水利委员会(NWC)任命,负责开发“地下水依赖生态系统(GDE)”地图集的第二阶段。该项目解决了缺乏澳大利亚GDE位置和特征的系统记录的问题。该公司表示,Atlas的开发预计将于2012年5月完成,这是收集有关GDE的所有已知信息以及开发重要的GDE新知识的重要第一步,并将用作主要参考。有关将来的GDE信息。 SKM能力营销经理Alex Paton解释说:“ GDE Atlas的最终目标是促进在水的规划和分配过程中纳入环境地下水的使用。”

著录项

  • 来源
    《Water21》 |2011年第4期|p.20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号