首页> 外文期刊>World Dredging >Terminal Build-Out to 2025 will Apply Unprecedented Environmental Measures as First EIR Under San Pedro Bay Ports Clean Air Action Plan
【24h】

Terminal Build-Out to 2025 will Apply Unprecedented Environmental Measures as First EIR Under San Pedro Bay Ports Clean Air Action Plan

机译:到2025年的候机楼扩建将采用前所未有的环境措施,这是圣佩德罗湾港口清洁空气行动计划下的首个EIR

获取原文
获取原文并翻译 | 示例
           

摘要

It was December 6, 2007 in San Pedro, California (CA) that the Los Angeles Harbor Commissioners approved the Berth 136-147 TraPac container terminal expansion project - first major capital improvement project in the San Pedro Bay Port in seven years. The TraPac container terminal project is also the first major project in the nation's leading seaport complex to apply groundbreaking emissions mitigation measures outlined in the San Pedro Bay Ports Clean Air Action Plan (CAAP) which was approved the prior year by Los Angeles and Long Beach port commissioners. Manson Construction Co. of Seattle, Washington (WA) recently won the contract to begin dredging in 2009.
机译:正是在2007年12月6日,在加利福尼亚州圣佩德罗(CA),洛杉矶港口专员批准了Berth 136-147 TraPac集装箱码头扩建项目,这是七年来圣佩德罗湾港口的首个重大资本改善项目。 TraPac集装箱码头项目也是美国领先的海港综合体中的第一个大型项目,该项目采用了San Pedro Bay港口清洁空气行动计划(CAAP)中概述的突破性排放缓解措施,该措施于去年获得了洛杉矶和长滩港的批准专员。华盛顿州西雅图市的曼森建筑公司(Manson Construction Co.)最近赢得了一份合同,该合同将于2009年开始疏dr。

著录项

  • 来源
    《World Dredging》 |2009年第2期|6-8|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号