首页> 外文期刊>World Dredging >The Cleanup of the Kinnickinnic River, A Model for Multi-Stakeholder Collaboration
【24h】

The Cleanup of the Kinnickinnic River, A Model for Multi-Stakeholder Collaboration

机译:多利益相关方协作的模型Kinnickinnic河的清理

获取原文
获取原文并翻译 | 示例
           

摘要

On November 2, 2009, a Kinnickinnic River Cleanup Celebration Event was held at the Paul Davis Restoration property on the banks of the river in Milwaukee, Wisconsin (WI) to highlight the completion of the dredging work, which was accomplished one month ahead of schedule and under budget. Locally referred to as the KK River, successful environmental dredging of the river was the result of many years of planning and collaboration among the US Environmental Protection Agency (EPA), the Wisconsin Department of Natural Resources (WDNR), the US Army Corps of Engineers (USACE), the Port of Milwaukee, the City of Milwaukee, and local stakeholders such as the Business Improvement District No. 35. By removing 167,000 yd3 of contaminated sediments from the river, this project successfully gained another step towards protecting the Great Lakes and delisting the Milwaukee Estuary Area of Concern (AOC). It also restored navigability, spurred revitalization of the riverfront, and augmented local confined disposal facility (CDF) expansion plans.
机译:2009年11月2日,在威斯康星州密尔沃基(威斯康星州)河岸的保罗·戴维斯修复场举行了一次Kinnickinnic河清理庆祝活动,以强调疏ed工作的完成,该工作比原计划提前了一个月且预算不足。在当地被称为KK河,成功进行河道的环境疏ging是美国环境保护署(EPA),威斯康星州自然资源部(WDNR)和美国陆军工程兵团多年的计划与合作的结果(USACE),密尔沃基港,密尔沃基市以及当地利益相关者,例如35号业务改善区。通过从河流中清除167,000 yd3的污染沉积物,该项目成功地朝着保护大湖和取消关注的密尔沃基河口地区(AOC)。它还恢复了通航性,刺激了河滨地区的复兴,并扩大了当地密闭处置设施(CDF)的扩张计划。

著录项

  • 来源
    《World Dredging》 |2009年第8期|21-27|共7页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号