...
首页> 外文期刊>World review of intermodal transportation research >35M MAX: the first bus rapid transit system in Salt Lake County
【24h】

35M MAX: the first bus rapid transit system in Salt Lake County

机译:35M MAX:盐湖县首个公交快速运输系统

获取原文
获取原文并翻译 | 示例
           

摘要

Bus rapid transit (BRT) is becoming one of the most popular transit services in the USA. A total of 106 miles of BRT service is scheduled for deployment in the State of Utah in future years. This research looked at the first BRT deployment in West Valley City, Salt Lake County, Utah. The 10.8 miles long BRT line was launched on July 14, 2008, and shortly after the launching the first operational data became available. In addition, a series of surveys were conducted to gain feedback from the users of the BRT system. Preliminary results show significant improvements in transit operations, with a 33% increase in ridership, reductions of close to 15% in travel times and improved reliability. Survey results show a high degree of acceptance among the system users. In general, the BRT system has proven itself to be very successful, bringing significant improvements to transit riders.
机译:快速公交(BRT)成为美国最受欢迎的公交服务之一。计划在未来几年在犹他州部署总计106英里的BRT服务。这项研究着眼于在犹他州盐湖县西谷市的首次BRT部署。长达10.8英里的BRT线路于2008年7月14日发射,并在发射后不久获得了第一批运营数据。此外,进行了一系列调查以获取BRT系统用户的反馈。初步结果表明,过境运营有了显着改善,乘客数量增加了33%,旅行时间减少了近15%,可靠性得到了提高。调查结果表明,系统用户对此表示满意。总体而言,BRT系统已证明自己非常成功,为过境乘客带来了重大改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号