会议名称:

Underground construction technology international conference and exhibition

召开年:

2015

召开地:

Houston, TX

会议文集:

Underground construction technology international conference and exhibition 2015: Underground construction technology international conference and exhibition 2015 (UCT 2015), 27-29 January 2015, Houston, Texas, USA

主办单位:

American Pipeline Contractors Association American Gas Association Association of Equipment Manufacturers

出版时间:

-
全选 (0)
397条结果 1/20
  • 题名 作者 来源 发表时间 操作
  • Manhole Rehabilitation: Design Engineering, Installation and Quality Assurance Testing

    作者:Norman E. 'Ed' Kampbell; 会议名称:Underground construction technology international conference & exhibition 2016年

    In a previous paper entitled "The Practical Design Approach to Coatings and Liners for the Rehabilitation of Cylindrical Shaped Manhole Structures" the author presented useful information on how the soil-structure interaction system impacts the lateral loading on a cylindrically-shaped vertical shaft (or manhole) and how it deviates significantly from the longitudinal vertical loading of horizontally oriented buried pipes; and with that knowledge, what loads are likely to be borne by the coatings or lining systems used in their renewal. In this paper the author presents how the engineer receives delivery on the assumptions used in his/her design through the employment of proper installation and quality assurance practices which are to be conveyed in the project specifications. While all coatings rely on an adhesive bond with the existing wall surface of the manhole structure, liners can be either bonded or un-bonded to the wall surface of the structure. The above referenced paper on design demonstrated that the load coming onto these coatings and liners is, for all practical purposes, that of the external hydrostatic pressure generated by the groundwater surrounding the structure. In the design case of a bonded liner or coating, it is imperative that the level of adhesion accounted for in the engineer's design process be attained by the contractor's installation practices in the field. Further, because of the challenges of working in these structures; it is incumbent upon the engineer to lay out a quality assurance testing methodology that confirms that a minimum level of adhesion was achieved throughout the structure. Un-bonded liners are, by definition, relying upon their own inherent strength to attain the stated design life of the renewal. Long-term structural stability of these un-bonded cylindrical shells is a function of the flexural modulus of the cured lining system, the level of uniformity of the cylindrical shell's shape (i.e. variations in the radii along the vertical axis), and the type of end termination detailed for the proposed shell structure at the bottom of the manhole. Additionally, the shell must be able to maintain its water-tightness at the bottom of the manhole. Flexible un-bonded shell materials must be designed to account for the linearly increasing external loading acting on the liner and the deformation that will result from this loading configuration over the designed service life of this renewal system. Seals are thus quite essential for these shells. The installation and quality assurance practices must reflect the needs of the lining system(s) chosen by the Engineer; thereby assuring the owner that the performance expectations of the work will be achieved for the necessary service life period.

    关键字:

  • Manhole Rehabilitation: Design Engineering, Installation and Quality Assurance Testing

    Norman E. 'Ed' Kampbell;

    Underground construction technology international conference & exhibition

    2016年

  • PennDOT Interstate 84 Culvert Rehabs

    作者:Dingmans Ferry; 会议名称:Underground construction technology international conference & exhibition 2016年

    Issues in the general permit were discovered including: 1. misinterpretation of the HY-8 hydraulic analysis results regarding flow characteristics (inlet control vs outlet control) 2. statements by the DEP biologist were in error 3. the full impact of high outlet velocities was overlooked 4. use of CIPP would likely not provide a 100 year service life in this environment (abrasion level 4, freeze/thaw zone).

    关键字:

  • PennDOT Interstate 84 Culvert Rehabs

    Dingmans Ferry;

    Underground construction technology international conference & exhibition

    2016年

  • 3D LIDAR for 3D Mapping

    作者: 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Accurate information for use in As-Built drawings 2. Gyro data easily uploads into Auto CAD and GIS Platforms 3. Map utilitiesnot availableto conventional survey (e.g. river crossings, deep utilities, HDD lines) 4. Integration of exact positional location with CCTV- identified anomalies allows for accurate, cost-effective spot repairs 5. Not subject to soil type, adjacent utilities, equipment depth limitations 6. Locates and quantifies defects such as pipe sags, misaligned joints, horizontal and vertical design affects 7. Provides pipeline center-line 3D geometry: 7.1 Bending radius 7.2 Line and Arc Segmentation 8. Ableto map underwater.

    关键字:

  • 3D LIDAR for 3D Mapping

    Underground construction technology international conference & exhibition

    2016年

  • The Challenges of Constructing a Siphon Underneath the San Antonio River

    作者:Joseph Cotton; 会议名称:Underground construction technology international conference & exhibition 2016年

    Construction of 1. Bore Launching and Receiving Pits 2. Jack and Bore Installation of 54" and 60" Steel Casings (approximately 210 linear feet each) 3. Triple Barrel Inverted Siphon 3.1 2 - 24" Fusible PVC 3.2 1 -16" Fusible PVC 4. 12" Air Jumper 5. 2 Siphon Boxes 6. Replacement of 36" Double Wall Brick Gravity Main with 36" PVC Gravity Main 7. Temporary By-Pass Gravity Mains.

    关键字:

  • The Challenges of Constructing a Siphon Underneath the San Antonio River

    Joseph Cotton;

    Underground construction technology international conference & exhibition

    2016年

  • Three Dimensional Scanning for Repair Planning

    作者:Harry R. Price;Jason Edberg;Jason Mayer;Fritz Klingler;Sid Lockhart;Jason Matteo; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. 3D Scanning is useful in confined areas with limited work time 2. With a structure attacked by MIC it is very useful for document existing conditions 3. In confined structures it may be necessary to construct additional access.

    关键字:

  • Three Dimensional Scanning for Repair Planning

    Harry R. Price;Jason Edberg;Jason Mayer;Fritz Klingler;Sid Lockhart;Jason Matteo;

    Underground construction technology international conference & exhibition

    2016年

  • A Road Map for Sewer Rehab

    作者:George Kurz; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Based on actual field results in Nashville & Brentwood 2. Largest published database for measured Ⅰ/Ⅰ reduction in the US 3. Analyzed 126 miles of rehabilitation (282 miles total - ~ 11% system) 4. Ⅰ/Ⅰ cut in half 5. 123 overflows eliminated 6. EPA commends stream improvements.

    关键字:

  • A Road Map for Sewer Rehab

    George Kurz;

    Underground construction technology international conference & exhibition

    2016年

  • Rehabilitation of Sewer Service Laterals Crucial to program success!

    作者:George Kurz; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Why renew laterals ? 2. Sparse project information 3. Methods 4. Example pilot project 5. Verify effectiveness.

    关键字:

  • Rehabilitation of Sewer Service Laterals Crucial to program success!

    George Kurz;

    Underground construction technology international conference & exhibition

    2016年

  • Alabama & Gulf Coast Railway (AGR) - Reline Under an Active Railroad

    作者:Don Herbert;Chris Frank; 会议名称:Underground construction technology international conference & exhibition 2016年

    Alabama & Gulf Coast Railway (AGR) 1. AGR began operations in Monroeville, AL in 1997 from Kimbrough, AL to Pensacola, FL from BNSF 2. In 2003, AGR expanded from Kimbrough, AL to Columbus, MS, with operations to Mobile, AL via NS and Amory, MS via BNSF 3. Operates total of 442 miles of track through MS, AL and FL 4. Major commodities include lumber, paper products, chemicals, wood chips, metal and j crude oil 5. Interchanges with BNSF, CAGY, CSXT, CN, GTRA, KCS, MNBR, NS and TASD.

    关键字:

  • Alabama & Gulf Coast Railway (AGR) - Reline Under an Active Railroad

    Don Herbert;Chris Frank;

    Underground construction technology international conference & exhibition

    2016年

  • Evolution of PVC Restrained Joint Piping Systems

    作者:Joshua Clapper; 会议名称:Underground construction technology international conference & exhibition 2016年

    Continuous Improvement Pays Big Dividends - Evolution of PVC Restrained-Joint Piping Systems Segmented restrained-joint PVC pipe has been a well-accepted product as a result of the numerous advantages it offers to the Engineering and Contracting communities. These advantages include corrosion resistance, joint strength, flow performance, and ease of assembly with minimal right-of-way disruption. As more experience has been gained, spline-lock PVC pipe has been enhanced with a more robust sealing system for enhanced hydraulic integrity, and to better tolerate various installation conditions, including bending and angular deflection often seen on the job-site. The presentation will highlight the engineering design, development, and structural analysis of the enhanced system in C900 sizes. Segmented systems allow for quick installation, especially where assembly must take place within pits. Presentation will also focus on the rigorous product qualification process, which involved lab tests and customer trials. Product applications include water transmission, sewer force mains, and storm sewers where Horizontal Directional Drilling and Static Pipe bursting methods are used. Products can also be used for conventional open-cut construction where there is a need to eliminate concrete thrust blocks. Presentation will utilize case studies from several projects to illustrate the new technology solution. Mission of the Session This presentation will of interest to Consulting Engineers, Municipal Engineers, and Contractors, as the information to be presented will provide them with a way to confidently consider multiple materials for trenchless projects.

    关键字:

  • Evolution of PVC Restrained Joint Piping Systems

    Joshua Clapper;

    Underground construction technology international conference & exhibition

    2016年

  • City of Waterloo, Albert St. Demo - July 2015

    作者: 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Cleaning aged water mains with airborne stone provides a dry cleaning process that is very fast, reduces the construction footprint, and provides a "best-bond" surface for all classes of pressure pipe liners. 2. The process has now been further developed and piloted to include airborne NSF 61 barrier coatings, making it a complete, economical life-extension technology for pressure pipes. 3. This novel cleaning and lining technology enables rapid return to service and can be deployed by water utility maintenance crews. 4. Future research will focus on new composite polymeric linings that provide higher strength and total corrosion protection.

    关键字:

  • City of Waterloo, Albert St. Demo - July 2015

    Underground construction technology international conference & exhibition

    2016年

  • LESSONS LEARNED FROM EXISTING 20' DUCTILE IRON PIPE WITH 20' FUSIBLE PVC

    作者:JEFF GREENE; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. The team successfully accomplished a 20-inch-diameter DIP bursting project that has the longest single DIP bursting pull in the United States. 2. There were no sewer spills. 3. There were no reported traffic accidents. 4. The team worked together for expedited submittal approval and took a collaborative approach to addressing issues in the field to meet the final date. 5. The project won the Pinnacle award for the best Utility Project in North and South Carolina.

    关键字:

  • LESSONS LEARNED FROM EXISTING 20' DUCTILE IRON PIPE WITH 20' FUSIBLE PVC

    JEFF GREENE;

    Underground construction technology international conference & exhibition

    2016年

  • PCCP Transmission Main Inspection

    作者:Jennifer Steffens; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. No leaks or gas pockets 2. 10 pipe sections indicating wire break damage 2.1 0.72% of total pipe sections 3. Two pipe sections indicating high level of distress based on structural analysis 4. Statistical analysis suggests serviceability of 16 years 5. Re-inspect in 5 to 8 years.

    关键字:

  • PCCP Transmission Main Inspection

    Jennifer Steffens;

    Underground construction technology international conference & exhibition

    2016年

  • Steel Slip Lining of 90 inch PCCP

    作者:David Markert;Cole Kratochvil; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Constructed from 1972 to 1974 1.1 5 separate contracts 1.2 72", 90", 96", and 108" 2. Pipeline Capacity 220MGD 2.1 Raw water from CAP Canal 2.2 30% of Phoenix drinking water 2.3 40% of Mesa drinking water 2.4 Gravity pipeline (85psi max.).

    关键字:

  • Steel Slip Lining of 90 inch PCCP

    David Markert;Cole Kratochvil;

    Underground construction technology international conference & exhibition

    2016年

  • Fused PVC Conduit and Casings for High Voltage Cables

    作者:Tom Marti; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Fused PVC provides a trenchless capability for high voltage electrical conduits and casings with the same non-conductive plastic material commonly used for duct banks 2. Fused PVC provides excellent thermal resistivity and internal COF 3. Fused PVC is extruded and fused to the same high quality standards as pressure water pipe 4. Fused PVC allows lengths for non-metallic casings and conduits that previously could not be considered.

    关键字:

  • Fused PVC Conduit and Casings for High Voltage Cables

    Tom Marti;

    Underground construction technology international conference & exhibition

    2016年

  • Horizontal Directional Drilling (HDD) Technology Advancements to Mitigate Environmental Issues and Reduce Carbon Footprints

    作者:Seth Matthesen; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Drilling fluids are essential in any HDD installation. 2. Fluid carries cuttings out of the bore hole. 3. Disposing of used fluid can be time consuming and costly. 4. Topics: Drilling-fluid returns and the environmental perception.

    关键字:

  • Horizontal Directional Drilling (HDD) Technology Advancements to Mitigate Environmental Issues and Reduce Carbon Footprints

    Seth Matthesen;

    Underground construction technology international conference & exhibition

    2016年

  • Track Ⅵ-B = HDD: PRODUCTIVITY & FLUID MANAGEMENT

    作者: 会议名称:Underground construction technology international conference & exhibition 2016年

    To make participants familiar and comfortable 1. Understand basic tricone designs 2. Working with a tricone bits and understanding limitations and preventive maintenance necessary. 3. Understanding dull grading tricone bits. 4. Understanding the importance or dull grading and maintaining well documented bit performance.

    关键字:

  • Track Ⅵ-B = HDD: PRODUCTIVITY & FLUID MANAGEMENT

    Underground construction technology international conference & exhibition

    2016年

  • Compact, Powerful JT9

    作者:Gregg Wilder; 会议名称:Underground construction technology international conference & exhibition 2016年

    Simple and Reliable 1. High on board capacity of drill rod (Up to 350 feet) 2. Compact HDD now consistently capable of 8" bores 2.1 Horsepower to provide both torque and mud volumes 3. Direct hydraulic control 4. No daily grease zerks.

    关键字:

  • Compact, Powerful JT9

    Gregg Wilder;

    Underground construction technology international conference & exhibition

    2016年

  • PIPE JACKING DESIGN SOLUTIONS IN SIOUX CITY, IA

    作者:Patrick Minger;Robin Lorenzen; 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Project Name: The I-29 Segment 2 Utility Replacement Project 2. Location: Sioux City, IA 3. General Contractor: Minger Construction, Inc. 4. Engineer: HR Green, Inc. 5. Purpose: To enhance the City's southern corridor near the Missouri River and Downtown Sioux City, improve safety, traffic operations and surrounding infrastructure. 6. Timeline: October 2014- October 2015.

    关键字:

  • PIPE JACKING DESIGN SOLUTIONS IN SIOUX CITY, IA

    Patrick Minger;Robin Lorenzen;

    Underground construction technology international conference & exhibition

    2016年

  • Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE

    作者: 会议名称:Underground construction technology international conference & exhibition 2016年

    1. Gulf Coast Water Authority and City of League City, Texas faced with need to renew critical 39-inch PCCP water transmission main along Calder Road 2. PCCP main installed in 1971 which was susceptible to severe breaks due to internal wire corrosion 3. Calder Road is scheduled for reconstruction and widening 4. City of League City receives treated waterfrom two sources 4.1 City of Houston's SE WTP to the north 4.2 Gulf Coast Water Authority's Thomas Mackey WTP to the south 5. Full Structural Solution Required to meet: 5.1 All internal pressures (125 psi) 5.2 All external loading requirements 6. No support from the host pipe.

    关键字:

  • Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining™ and HDPE

    Underground construction technology international conference & exhibition

    2016年

  • Thermal Grouting: PSE&G (NJ) Southern and Northeastern Reinforcement Projects

    作者:Guy Dickes; 会议名称:Underground construction technology international conference & exhibition 2016年

    Thousands of Cubic Yards of Thermal Grout Installed Smallest Crossing: 12 cubic yards Largest Crossing: 380 cubic yards Upcoming- multiple HDD Crossings: 900 cubic yards each.

    关键字:

  • Thermal Grouting: PSE&G (NJ) Southern and Northeastern Reinforcement Projects

    Guy Dickes;

    Underground construction technology international conference & exhibition

    2016年

服务协议

服务协议


掌桥科研助手微信平台(简称“本平台”)外文文献服务的所有权和运营权归属六维联合信息科技(北京)有限公司(简称“六维联合”)。在购买本平台外文文献服务前,请您仔细阅读本服务协议的如下全部内容,以便您决定是否继续购买本平台的服务,您的继续购买行为即表示您已经完全理解并接受本服务协议,并同意受其约束。若您不同意本服务协议,请勿购买本平台的服务。

1.服务说明

(1)要成为系统服务用户必须自行配备上网的所需设备,包括个人微信使用终端、调制解调器或其他必备上网装置,并自行负担个人上网所支付的与此服务有关的网络费用;

(2)用户应向本平台上提供单位名称、姓名、电子邮箱、手机号码,通过手机验证后才能收到外文文献电子邮件;

(3)除按照国家法律法规、第三方(本服务中指国家工程技术图书馆)和本服务要求提供用户的个人资料外,本平台不额外要求用户提供个人隐私信息;

(4)外文文献一经购买,无论用户是否实际使用,不得退款;

(5)外文文献原文是由国家工程技术图书馆负责提供。

2.合理使用

根据相关法律规定,本平台及其所提供的外文期刊、外文会议、外文学位论文和外文科技报告文献仅供购买服务的用户(即授权用户)为个人目的或课堂教学目的使用,授权用户可以对本平台的文献进行以下合理使用:

(1)通过安全网络访问服务器对网络数据库进行检索;

(2)以个人研究和学习为目的,在线阅读检索结果;

(3)通过文献传递获取电子文献供授权用户个人研究和学习使用;

(4)非以商业营利为目的承担正常教学任务的授权用户,为教学需要,可少量复制文献供教学人员使用,同时应指明作者姓名和文献名称。例如授权用户可少量复制作为教学参考资料的文献供从事课堂教授的教师使用,可少量文献复制到供本单位教学使用的内部网络中的安全计算机上,供选修特定课程的学生在该课程课堂教学期间和地点通过内部网络进行阅读。

3.侵权行为

除上述合理使用方式外,不得以任何方式对本平台全部或者部分文献进行复制、出版、发行、传播、转让、商业或其他开发,授权用户以下(但不仅限于以下)超出合理使用范围的行为,属侵犯知识产权行为,须严格禁止:

(1)把外文文献以公共方式提供给非授权用户使用;

(2)利用外文文献对非授权用户提供文献服务;

(3)利用外文文献进行商业服务或支持商业服务;

(4)利用外文文献内容汇编生成二次产品,提供公共或商业服务;

(5)将外文文献使用在任何其他网站或计算机联网环境中,包括但不仅限于在国际互联网和万维网站上。

4.侵权责任

授权用户应在法律规定的其超出合理使用范围内使用本平台提供的文献,若因授权用户的侵权使用行为被相关权利人主张权利而产生任何纠纷、仲裁、诉讼,或遭到国家相关部门处理,由授权用户承担全部法律责任并使本平台方免责,授权用户还应赔偿因上述原因给本平台方造成的全部直接和间接损失,包括但不限于律师费用、诉讼及仲裁费用、财务费用及差旅费等。一经发现用户的使用情况超出著作权法规定的合理使用范围,本平台有权立即封禁该用户的服务账户,并有权终止向用户提供本协议约定的服务而无须承担违约责任。

5.免责声明

(1)本平台仅为根据您的搜索指令提供搜索服务、数据链接服务和电子邮件原文传递服务,搜索结果和原文数据均来自第三方网站,六维联合不会对第三方网站内容作任何实质性的编辑、整理、修改;

(2)本平台对服务及服务所涉文献信息不作任何明示或暗示的保证,包括但不限于服务一定会满足用户的使用要求、服务的及时性、持续性、安全性、准确性以及服务所涉及文献的准确性、完整行、可靠性;

(3)本平台不保证所提供的服务和服务所涉文献信息来源客观准确,对于任何因信赖或使用获取的文献信息,而给用户造成任何直接或间接损失,本平台均不承担责任;本平台不因用户与任何第三方产生的争议或诉讼承担任何责任。

(4)用户签署本协议即意味着理解且不要求六维联合在发生不可抗力情况下承担责任。不可抗力是指不能合理控制、不可预见或即使预见亦无法避免的事件,包括但不限于政府行为、地震、台风、洪水、火灾或其它天灾、战争或任何其它类似事件。鉴于互联网之特殊性质,不可抗力还包含非因本平台原因导致本服务无法正常运行、服务中断或延迟的情形,包括黑客攻击,电信部门技术调整导致之重大影响,因政府管制而造成之暂时关闭,病毒侵袭,网站升级、系统停机维护或通讯终端、电信设备出现故障导致无法进行数据传输等。

6.其他规定

(1)本协议内容受中华人民共和国法律的约束。如果本协议中任何规定被裁定为无效或不可强制执行,该项规定应被撤销,而其余规定继续有效。

(2)本协议的最终解释权归六维联合。

(3)本协议条款可由六维联合随时全部或部分转让。未经六维联合事先明确书面同意,用户不得以任何方式转让本协议条款。

注意:六维联合未就您或其他人士的某项违约行为采取行动,并不表明六维联合就任何继后或类似的违约事件放弃采取行动的权利。


我已阅读并同意《服务协议》