...
首页> 外文期刊>Pipe Line & Gas Industry >BP uses Clock Spring system to repair crude oil pipe line
【24h】

BP uses Clock Spring system to repair crude oil pipe line

机译:BP使用Clock Spring系统修复原油管道

获取原文
获取原文并翻译 | 示例
           

摘要

Although there is still a place on the market for split-sleeve repair systems, Clock Spring turned out to be the ideal solution for the difficult conditions encountered in repairing the Ninian pipe line. The composite wrap was easy to transport and install, required minimum clearance under the line, and was readily available at reasonable cost. Furthermore, the system is guaranteed for the life of the line. Endurance testing suggests a field life in excess of fifty yearsThis repair of the Ninian line also emphasizes the need for good house-keeping standards during construction. Had the grinding disc been disposed of properly in 1976, the defect would not have occurred.
机译:尽管市场上仍然有裂套维修系统的市场,但Clock Spring却是解决Ninian管道维修中遇到的困难条件的理想解决方案。复合包装纸易于运输和安装,在生产线下需要最小的间隙,并且易于以合理的价格获得。此外,该系统可保证生产线的使用寿命。耐久性测试表明其使用寿命超过五十年。对Ninian线路的维修还强调了在施工过程中需要保持良好的内务管理标准。如果在1976年正确处理了研磨盘,则不会发生该缺陷。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号