...
【24h】

Saving builder time

机译:节省建造时间

获取原文
获取原文并翻译 | 示例
           

摘要

Chattanooga Gas Co. (CGC) is helping home builders get new residential construction approved and sold faster with a program called "MeterExpress." The program allows the meter to be installed within 48 hours of the service line installation and puts the builder in control of mechanical inspection and appliance light up.In the new program, gas service is left available up to the integral outlet valve on the meter. Once the house passes inspection, a licensed HVAC/plumbing contractor can tie in the home's fuel line to the outlet valve, turn on the gas and light the appliances. CGC says there is a time and cost savings because utility technicians no longer will be needed to go into new facilities and light appliances. Instead builders can handle the timing and execution.To achieve quick meter installation, CGC says it will be using a new one-piece meter loop and outlet valve that is welded at the factory and does not require on-site assembly.
机译:查塔努加天然气公司(CGC)通过名为“ MeterExpress”的计划,帮助房屋建筑商批准新的住宅建筑并加快销售速度。该程序允许在维修管线安装后的48小时内安装仪表,并使建造者能够进行机械检查和设备点亮的控制。在新程序中,燃气维修一直到仪表上的整体出口阀可用。房屋通过检查后,有执照的HVAC /水暖承包商可以将房屋的燃油管线绑在出口阀上,打开燃气并点燃电器。 CGC说,这将节省时间和成本,因为不再需要公用事业技术人员来安装新的设施和照明设备。 CGC表示,它将使用新的一体式仪表回路和出口阀,在工厂进行焊接,无需现场组装,他们可以安排时间和执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号