...
首页> 外文期刊>E&P daily >Det norske cuts rig costs
【24h】

Det norske cuts rig costs

机译:挪威船级社削减钻机成本

获取原文
获取原文并翻译 | 示例
           

摘要

Det norske is using vessels instead of rigs for the cutting and removal of exploration wells, making it the first company to do so on the Norwegian Continental Shelf. Det norske has signed a three-year framework agreement with Norse Cutting & Abandonment (NCA), including a two-year option. Director of drilling in Det norske, Anton Tronstad said: "This allows us to release the rigs earlier so they can faster do what they are built for, namely drilling wells. It reduces the costs for this part of the operation since it is done with a vessel which has far lower daily costs than a rig." After completing the drilling of an exploration well, the rig will secure the well in accordance with the PSA regulations, including a trawl protection installed over the wellhead.
机译:挪威船级社(Det norske)正在使用船只而非钻井平台来切割和拆除勘探井,这使其成为挪威大陆架上首家这样做的公司。挪威船级社(Det norske)与北欧切割与放弃(NCA)签署了一项为期三年的框架协议,其中包括一项为期两年的选择权。 Det norske的钻探主管Anton Tronstad表示:“这使我们能够更早地释放钻机,以便他们能够更快地完成其建造目的,即钻探井。由于完成了这部分操作,因此降低了成本日常费用远低于钻机的船只。”在完成勘探井的钻探后,钻机将按照PSA法规对井进行固定,包括在井口上方安装拖网保护装置。

著录项

  • 来源
    《E&P daily》 |2010年第5期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号