Statoil’s Gudrun project in the Norwegian North Sea is forging ahead with the West Epsilon rig busy drilling wells that need to be ready for production start in 2014. All seven production wells planned for the Gudrun field will be pre-drilled through the jacket before the topside is installed in 2013.
展开▼