首页> 外文期刊>CRU Views Steel-Weekly >Australian steel works could be shut down
【24h】

Australian steel works could be shut down

机译:澳大利亚钢铁厂可能被关闭

获取原文
获取原文并翻译 | 示例
           

摘要

Arrium has begun preparations to place its integrated Whyalla works and magnetite ore-based supply chaininto care and maintenance if the operation's cash losses cannot be halted. Planning work is due to becompleted by mid-2016The option comes about after Whyalla posted an operating loss of A$43 M (US$30.7 M, ?27.5 M), includingA$24 M of capital expenditure, in fiscal H1 December. The deficit was mainly due to low Asian steel pricesand fixed iron ore feed costs, the company said.
机译:如果无法停止运营的现金损失,Arrium已开始准备将其综合的Whyalla工厂和基于磁铁矿的供应链置于维护和保养中。计划工作将于2016年年中完成。该选择权是在Whyalla在12月上半年公布运营亏损4300万澳元(3070万美元,2750万欧元),包括2400万澳元的资本支出之后做出的。该公司表示,赤字主要是由于亚洲钢铁价格低廉和固定的铁矿石饲料成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号