...
首页> 外文期刊>Platts Metals Daily >Average us steel mill lead times inch down to close year
【24h】

Average us steel mill lead times inch down to close year

机译:平均美国钢厂的通货膨胀时间为近距离

获取原文
获取原文并翻译 | 示例
           

摘要

Houston—Average US steel mill lead times for all the sheets, other than plate, edged down amid lower buying activity during the holidays, according to S&P Global Platts data. US mills’ average HRC lead time dropped 0.1 week to 5.6 weeks. HRC lead times rose above six weeks in mid-November on the back of price hikes. The lack of trading activity during the holidays, however, caused slight drops in HRC lead times, which remained below six weeks for the fourth consecutive week.
机译:根据S&P Global Platts数据,休斯顿平均所有床单的钢材磨削时间,除板上,除了板块外,在假期较低的购买活动中,下降。 美国米尔斯的平均HRC汇流时间下降0.1周至5.6周。 11月中旬在11月中旬,HRC交货时间上涨超过110周的价格徒步旅行。 然而,假期期间缺乏交易活动导致HRC交货时间轻微下降,这连续第四周持续六周。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号