Modularization Program Execution Optimization on Mega Oil Sands Projects

机译:巨型油砂项目的模块化程序执行优化

获取原文
获取原文并翻译 | 示例
           

摘要

In order to minimize overall construction cost and time subject to local resource constraints, oil sands projects in Northern Alberta have generally been executed using a modular approach, which involves fabricating and assembling modules and shipping them for installation on-site. However, despite potential cost and time savings, for a mega project with hundreds of engineered modules, a modular approach presents a significant challenge: how can one optimize cost and schedule while adequately meeting field construction demands and satisfying constraints such as budget, contractors' production capacities, road bans and transportation conditions, module size, freight shipping limits, site layout and capacities of temporary site facilities. To address this challenge, this paper proposes a quantitative methodology which combines resource-constrained scheduling and Monte Carlo simulationbased risk analysis. This proposed methodology is applied in a case study of an Alberta-based Owner Company using realistic oil sands project data. This methodology could potentially improve overall project management for owner companies through streamlining decisionmaking and planning processes, most notably for the modular construction of mega projects.
机译:为了使总的建设成本和时间减少到最小,受当地资源的限制,艾伯塔省北部的油砂项目通常采用模块化方法来执行,该方法包括制造和组装模块并运输它们以进行现场安装。然而,尽管可能节省成本和时间,但对于具有数百个工程模块的大型项目而言,模块化方法仍面临巨大挑战:如何在优化成本和进度的同时充分满足现场施工需求并满足预算,承包商的生产等约束容量,道路禁令和运输条件,模块大小,货运限制,站点布局和临时站点设施的容量。为了应对这一挑战,本文提出了一种定量方法,该方法将资源受限的调度与基于蒙特卡洛模拟的风险分析相结合。拟议的方法论被应用在阿尔伯塔省一家业主公司的案例研究中,使用了真实的油砂项目数据。这种方法可以通过简化决策和计划流程来改善所有者公司的整体项目管理,尤其是大型项目的模块化建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号