L is the distance in meters (feet) on the summer load line from the fore side of the stem to the centerline of the rudder stock. For use with the Rules, L is not to be less than 96% and need not be greater than 97% of the extreme length on the summer load line. The forward end of L is to coincide with the fore side of the stem on the waterline on which L is measured.
展开▼