...
首页> 外文期刊>三菱重工技報 >Akashi Kaikyo Bridge, Tatara Bridge, Kurushima Kaikyo Bridge
【24h】

Akashi Kaikyo Bridge, Tatara Bridge, Kurushima Kaikyo Bridge

机译:见证技艺乙管理卯起来,多多罗乙管理d起来,来岛技艺乙管理卯起来

获取原文
获取原文并翻译 | 示例
           

摘要

Akashi Kaikyo, Tatara, and Kurushima KaikyoBridges linking Honshu to Shikoku is the longestsuspension cable-stayed bridge and the first triosuspension bridge in the world. Based on the newlydeveloped design and construction and experienceaccumulated in Honshu-Shikoku Bridge project, Wecompleted this large bridges the wind resistancetechnology applied to this bridges was developed withthe project. Tuned mass damper (TMD) systems anddampers between the stiffened girder and tower are usedin the Akashi Kaikyo Bridge, and dimple surface cablefur damping rain vibration is used in the Tatara Bridge.The girders of the Kurushima Kaikyo Bridge erected byall hinge erection and direct lifting on aninternational sea lane, where aerodynamic stability was confirmed.
机译:Akashi Kaikyo,Tatara和Kurushima Kaikyobridges将Honshu与Shikoku联系在一起是LongestspenseLyspions住宿的桥梁和世界上第一座Triosususpension桥。 根据新兴的设计和施工和经验在本湖岛桥梁工程中,这种大型桥梁应用于这座桥梁的风力抵制。 调谐质量阻尼器(TMD)系统和塔架之间的系统和塔架之间的系统均采用Akashi Kaikyo桥,塔塔拉桥使用凹坑表面衰减雨雨雨雨雨雨雨雨雨雨雨架。Kulushima Kaikyo Bridge的梁建立了Byall铰链勃起和直接提升 确认空气动力学稳定性的Aninternational Sea Lane。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号