...
首页> 外文期刊>Mining Engineering >Robotic arms to be installed on TBMs boring London's HS2 high-speed rail project
【24h】

Robotic arms to be installed on TBMs boring London's HS2 high-speed rail project

机译:机器人手臂安装在TBMS无聊伦敦的HS2高速铁路项目

获取原文
获取原文并翻译 | 示例
           

摘要

The robot works in a similar manner to robotic arms used on factory production lines: carrying out basic repetitive tasks: removing wooden spacers between tunnel segments and inserting connection dowels. Each of the 112,000 tunnel segments weighs up to 81 (8.8 st). They are delivered to the TBM with wooden spacers between them, which are typically removed by hand. The robot then places the dowels into position, in preparation for slotting the segment into place.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号