首页> 外文期刊>Rural Electric Magazine >AGILE, FRACTAL GRID:THE GRID OF THE FUTURE IS BEING BUILT NOW, ONE STEP AT A TIME
【24h】

AGILE, FRACTAL GRID:THE GRID OF THE FUTURE IS BEING BUILT NOW, ONE STEP AT A TIME

机译:敏捷,分形网格:现在建造的未来网格,一步一步

获取原文
获取原文并翻译 | 示例
           

摘要

Fewer than a thousand people live on Ocracoke Island, a narrow spit of land in North Carolina's Outer Banks, facing the Atlantic Ocean's breakers at the end of a three-hour ferry ride from the mainland. Some tallies put the number of year-round residents at fewer than 600 hardy souls.Whatever the actual number, they're all co-op members, served by Tideland Electric Membership Corporation and its G&T, North Carolina Electric Membership Corporation (NCEMC). They all live and work at the end of a transmission line that snakes along Hatteras Island to the north before plunging under the sea for 2 miles to tie Ocracoke's homes and businesses to the rest of North America. And they, and the thousands of seasonal visitors who fuel theeconomy, are all vulnerable to the threat of strong nd turbulent seas from hurricanes and winter storms.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号