...
首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Productivity of rock reinforcement: methodology development
【24h】

Productivity of rock reinforcement: methodology development

机译:岩石加固生产力:方法发展

获取原文
获取原文并翻译 | 示例
           

摘要

The working environment for ground support installation in mines has improved during the last 20-30 years, with more mechanized equipment for installation of ground support elements such as bolts, cable bolts, and screens. Ground support installation productivity has, however, not followed the same development curve, remaining more or less constant. In some cases, for example the mechanized installation of bolts, productivity has even dropped. One reason for this is that modern mechanized bolt rigs are complex. In this paper we evaluate manual and mechanized ground support systems, propose a way to measure the productivity of bolt rigs, and make relevant comparisons between different mines and equipment. Some productivity measures for rock reinforcement are suggested, using productivity results from eight case study mines.
机译:在过去20-30年中,矿山地面支架安装的工作环境有所改善,安装地面支架元件(如螺栓、电缆螺栓和筛网)的机械化设备有所增加。然而,地面支持安装生产率并未遵循相同的发展曲线,或多或少保持不变。在某些情况下,例如螺栓的机械化安装,生产率甚至有所下降。其中一个原因是现代机械化锚杆钻机非常复杂。本文对人工和机械化地面支护系统进行了评估,提出了一种测量锚杆钻机生产率的方法,并对不同矿山和设备进行了相关比较。利用八个案例研究矿山的生产率结果,提出了一些岩石加固的生产率措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号