首页> 外文期刊>PetroChemical News >BUA Refinery Picks Novolen Technology For New PP Plant at Nigerian Refinery
【24h】

BUA Refinery Picks Novolen Technology For New PP Plant at Nigerian Refinery

机译:Bua炼油厂为尼日利亚炼油厂挑选新的PP工厂

获取原文
获取原文并翻译 | 示例
           

摘要

Abuja-Lummus Technology's Novolen business has been awarded a contract from BUA Refinery to supply technology for a new polypropylene (PP) plant to be built as part of BUA's grassroots refinery and petrochemicals project in Akwa Ibom, Nigeria. The 285,000-t/y PP facility will be the "first" unit in Nigeria to utilize Novolen PP technology. An expected completion date for the plant was not given. The refinery project is scheduled to come on stream in 2024.
机译:阿布贾-卢姆斯科技公司的诺富伦业务已从布瓦炼油厂获得一份合同,为一座新的聚丙烯(PP)工厂提供技术,该工厂将作为布瓦炼油厂和石化项目的一部分在尼日利亚阿克瓦伊博姆建造。28.5万吨/年聚丙烯设施将是尼日利亚“第一个”利用诺富伦聚丙烯技术的装置。没有给出该工厂的预期完工日期。炼油项目计划于2024年投产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号