首页> 外文期刊>China Metal Market: Lead & Zinc & Tin Monthly >Yuguang Gold-Lead kicks off last stage of 100,000tpy secondary lead project
【24h】

Yuguang Gold-Lead kicks off last stage of 100,000tpy secondary lead project

机译:Yuguang Gold-Lead在100,000二级领先项目的最后阶段开始

获取原文
获取原文并翻译 | 示例
           

摘要

Kenan-based Yuguang Gold-Lead Group Co., Ltd. recently kicked off the last stage of its l00,000tpy secondary lead project. The 100,000tpy secondary lead project, with a total investment of 260 million yuan, composes of three sub-projects: 80,000tpy crude lead project, 80,000tpy refining project and separation project. The first two stages were put into production in March and September 2005 respectively. Yuguang Gold-Lead Group plans to introduce CX breaker system from Italy for the separation project. Construction has been started in mid May and all the equipment is expected to be installed in early December this year.
机译:总部位于Kenan的Yuguang Gold-Lead Group Co.,Ltd。最近开始了其L00,000TPY中学项目的最后阶段。 100,000泰铢的二级潜在客户项目总投资为2.6亿元,由三个子项目组成:80,000tpy原油铅项目,80,000英尺的炼油项目和分离项目。 前两个阶段分别于2005年3月和2005年9月投入生产。 Yuguang Gold-Lead Group计划从意大利引入CX Breaker System进行分离项目。 施工已于5月中旬开始,所有设备预计将于今年12月上旬安装。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号