首页> 外文期刊>Metals Economics Group Strategic Report >Current Smelting And Refining Charges
【24h】

Current Smelting And Refining Charges

机译:当前的冶炼和精炼费用

获取原文
获取原文并翻译 | 示例
           

摘要

The following figures represent a range of delivered charges (US dollars/dry mt) currently being quoted for shipments of relatively clean concentrate for delivery periods of up to one year. In November 2007, Sterlite Industries settled 2008 TC/RCs with BHP Billiton at 45 dollars/mt and 0.45 dollar/lb for 260,000 mt/y of copper concentrate in 2008 and 2009. In December, Chinese smelters Tongling Nonferrous Metal Group, Jiangxi Copper, and Daye Nonferrous Metals accepted a TC/RC offer from BHP Billiton of 47.20 dollars/mt and 0.0472 dollar/lb, without price participation. In mid-February 2008, BHP Billiton and Freeport-McMoRan settled 2008 copper treatment charges with Japanese smelters, including Japan's biggest, Pan Pacific Copper, Sumitomo Metal Mining, and Mitsubishi Materials, at 45 dollars/mt and 0.045 dollar/lb, without price participation. Settlements were similar to 2007's mid-year contracts, but 25 percent lower than the 2007 benchmark of 60 dollars/mt smelting and 0.06 dollar/lb refining, with no price participation.
机译:以下数字代表了目前报价的一系列已交付费用(美元/干MT),该货物的运送期限相对干净,最多一年。 2007年11月,2008年的BHP Billiton以45美元/吨和0.45美元/lb的价格定居2008 TC/RCS,在2008年和2009年为260,000吨/y的铜浓缩量定居0.45美元/lb。 Daye非有产金属接受了必和必拓(BHP Billiton)的TC/RC优惠,为47.20美元/吨和0.0472美元/lb,没有价格参与。 2008年2月中旬,必和必拓和弗里波特·麦克莫兰(BHP Billiton)和弗里波特·麦克莫兰(Freeport-McMoran)在2008年用日本冶炼厂解决了2008年的铜处理费参与。定居点类似于2007年中期合同,但比2007年的60美元/吨冶炼和0.06美元/lb的基准低25%,没有价格参与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号