首页> 外文期刊>Oil review Africa >Two steps to first gas off Mozambique
【24h】

Two steps to first gas off Mozambique

机译:首先在莫桑比克燃气的两个步骤

获取原文
获取原文并翻译 | 示例
           

摘要

AMERICAN INDEPENDENT ANADARKO has taken the second major step towards a four train, 20mmtpa LNG plant from offshore Mozambique. The company's award of a front-end engineering and design (FEED) contract to a joint venture vehicle comprising Fluor and JGC came two weeks after it reached Heads of Agreement (HOA) with Eni, establishing foundational principles for the co-ordinated development of the common natural gas reservoirs spanning both Mozambique's Offshore Area 1 (operated by Anadarko) and Offshore Area 4 (operated by Eni). Anadarko targets the first LNG cargo for 2018. The facility will be located in the Cabo Delgado province, 2,000 km north-east of Mozambique's capital, Maputo.
机译:美国独立的阿纳达科(Anadarko)已迈出了从莫桑比克离岸的四列火车20mmtpa液化天然气工厂迈出的第二个重大一步。 该公司授予由荧光和JGC的合资车辆授予的前端工程和设计合同(FEAD)合同是在与ENI达成协议负责人(HOA)两周后,建立了协调开发的基础原则 跨越莫桑比克的海上区域1(由阿纳达科(Anadarko)运营)和海上4区(由ENI运营)的普通天然气储藏室。 阿纳达科(Anadarko)瞄准了2018年的第一家液化天然气货物。该设施将位于莫桑比克首都马普托(Maputo)东北200,000公里的Cabo Delgado省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号