首页> 外文期刊>Via inmarsat >Better bottom lines
【24h】

Better bottom lines

机译:更好的底线

获取原文
获取原文并翻译 | 示例
           

摘要

The cable ship Chamarel has upgraded its Inmarsat A to the greater efficiency and capability of Fleet F55 as part of its critical role maintaining subsea cables between Africa, Europe and Asia. Submarine fibre optic cables are a key component of fixed communications infrastructure. One of the more ambitious projects has been the laying of the SAT3-WASC-SAFE cable system, a US$600 million scheme linking Africa with Europe and Asia. This mammoth cable begins in Portugal and runs 14,350km (8,917 miles) along the entire West Coast of Africa, rounding the Cape of Good Hope and traveling a further 13,500km (8,389 miles) on to India and Malaysia.
机译:电缆其国际海事卫星船舶Chamarel升级了一个更大的效率和能力舰队F55作为其关键作用的一部分非洲,欧洲之间保持水下电缆和亚洲。组件的固定通信基础设施。一直是一个更加雄心勃勃的项目SAT3-WASC-SAFE电缆系统的铺设6亿美元计划连接非洲和欧洲和亚洲。并运行沿整个14350公里(8917英里)非洲西海岸,四舍五入的角希望和旅行13500公里(8389英里)印度和马来西亚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号