【24h】

Panel lays out tough conditions for Northern Gateway's crude pipeline.

机译:对北方面板列出了苛刻的条件网关的原油管道。

获取原文
获取原文并翻译 | 示例
           

摘要

A federal panel has proposed 199 conditions for Enbridge Pipeline to meet before the company will be allowed to carry out its plans for the construction of a 1.1K kilometer pipeline project between Edmonton, Alberta, and Kitimat, British Columbia. The conditions, which one observer said were more numerous than ever before attached to a pipeline project, included provisions requiring a $950MM insurance policy in case of a spill, rigorous inspections of the pipe every other year, special tugboats to accompany departing tankers, and careful monitoring of the environment, even down to the inclusion of provisions for caribou habitat restoration.
机译:199年联邦小组提出了条件安桥公司管道公司将之前见面被允许实施的计划1.1 k公里管道工程建设在埃德蒙顿,阿尔伯塔省,卡提玛特,英国人哥伦比亚大学。比以往更多附加到吗管道项目,包括规定要求950毫米的保险单在泄漏的情况下,管其他的严格检查特殊的拖船,伴随离开油轮,仔细监测环境,甚至包含规定驯鹿栖息地的恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号