首页> 外文期刊>Life Cycle Reliability and Safety Engineering >Development of risk-based inspection programme for BARC Research Reactors-Dhruva: experience and insights
【24h】

Development of risk-based inspection programme for BARC Research Reactors-Dhruva: experience and insights

机译:基于风险的检验项目的发展巴克研究Reactors-Dhruva:经验和的见解

获取原文
获取原文并翻译 | 示例
           

摘要

As part of defence-in-depth philosophy an In-Service Inspection programme for research reactors at BARC has been implemented. The current ISI methodology is based on deterministic approach through the application of rules and criteria provided in ASME Section 11 and Section 5. For the research reactor Dhruva two campaigns of ISI have been completed. The risk-informed approach is widely employed for Nuclear Power Plants; however, there is no published literature on Risk-informed ISI for a research reactor. Development work on risk-informed ISI has been performed for Dhruva and a document has been prepared and submitted to safety committees for review and approval. The objective is to utilize the available Level 1 PSA and ISI insights to optimize the ISI programme. This paper, discusses the development approach and insights gained from this project and provides recommendation on initiating activities to encourage other facilities to consider implementation of RI-ISI for research reactors.
机译:纵深防御哲学的一部分在职检验项目进行研究反应堆巴克已经实现。当前ISI方法是基于确定的通过应用程序的规则和方法标准ASME部分11和部分中提供5. ISI已经完成。方法被广泛用于核电植物;以反应为ISI为研究反应堆。以反应为ISI的开发工作执行Dhruva和文档准备和提交给安全委员会审查和批准。可用的一级PSA和ISI的见解ISI优化计划。获得的开发方法和见解这个项目并提供建议发起活动来鼓励其他设施考虑RI-ISI的实现研究反应堆。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号