首页> 外文期刊>Mathematical Problems in Engineering: Theory, Methods and Applications >Integrated Scheduling for Steelmaking Continuous Casting-Hot Rolling Processes considering Hot Chain Logistics
【24h】

Integrated Scheduling for Steelmaking Continuous Casting-Hot Rolling Processes considering Hot Chain Logistics

机译:Integrated Scheduling for Steelmaking Continuous Casting-Hot Rolling Processes considering Hot Chain Logistics

获取原文
获取原文并翻译 | 示例
           

摘要

Steelmaking continuous casting (SCC)-hot rolling (HR) is a key process in the production of steel products. It is also a process with large energy consumption. Energy saving has always been an important goal of production scheduling of this process. In this paper, aiming at integrated scheduling optimization for SCC-HR processes, energy saving objective is converted to minimize waiting time of slabs in slab yard, so as to reduce slab temperature loss and achieve the goal of saving energy. An integrated two-stage mathematical programming model is established for the above problems, and a hybrid algorithm of genetic algorithm and linear programming is designed for the integrated model. The correctness of the model and the validity of the algorithm are verified by computational experiments using simulated instances.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号