首页> 外文期刊>Iron & Steelmaker >Maintaining Casting Performance and the Continuous Improvement Process at Ispat Inland's No. 7 Blast Furnace
【24h】

Maintaining Casting Performance and the Continuous Improvement Process at Ispat Inland's No. 7 Blast Furnace

机译:Maintaining Casting Performance and the Continuous Improvement Process at Ispat Inland's No. 7 Blast Furnace

获取原文
获取原文并翻译 | 示例
           

摘要

An extensive amount of work has been completed to improve reliability and decrease variability within the casting operation at the No. 7 blast furnace by using the CIP process. This process enabled us to break down the interdependence of issues into components that could be attacked systematically enroute to continuous improvement. Quality control and refinements to taphole clay, preventative maintenance and modifications to existing equipment and a common goal supported by all casthouse personnel have been the avenue with which the improvements have been driven. A sidebar to a discussion on improvements would be incomplete without mentioning the improvement in safety within the casthouse (Figure 8). Attitude, awareness, housekeeping, inspections, proactive repairs and work done by safety committees (continuous improvement) have all been key contributors to the success. Due to current furnace conditions, a substantial amount of time and effort is spent maintaining the improvements already in place. Without the CIP process and improvements already made, furnace productivity would have suffered.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号