首页> 外文期刊>Lloyd s List >Port Hedland reopens after cyclone closure
【24h】

Port Hedland reopens after cyclone closure

机译:Port Hedland reopens after cyclone closure

获取原文
获取原文并翻译 | 示例
           

摘要

PORT HEDLAND, the world's biggest iron ore terminal, has reopened following a cyclone. As of April 14, tropical cyclone Ilsa has weakened to a category 3 system as it moves further inland, Pilbara Ports Authority, which runs Port Hedland along with other smaller ports, said in an advisory, citing the Bureau of Meteorology. The port authority has "undertaken inspections of navigation aids, the channel and berths and has confirmed safe operations can resume," it said, adding that as of 1100 hrs local time, Port Hedland would reopen.

著录项

  • 来源
    《Lloyd s List》 |2023年第4期|1-1|共1页
  • 作者

    Nidaa Bakhsh;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号