...
首页> 外文期刊>Roads & bridges >ORIGINAL AESTHETICS
【24h】

ORIGINAL AESTHETICS

机译:ORIGINAL AESTHETICS

获取原文
获取原文并翻译 | 示例
           

摘要

Initial phases of the 8th Street Bridge rehab project consisted of an in-depth inspection of the structure to quantify areas of deterioration, re-create existing plans of the structure for load rating analysis, analyze existing concrete characteristics through coring and petrographic analysis, conduct historical research, and provide a summary of findings with recommendations. At over 100 years old, deterioration was prevalent throughout the structure. The most significant amounts of deterioration were located on the underside of the arches within the outer 10 ft on the north and south edges of the bridge. Reinforcement was exposed and showed 70% section loss. The bridge had experienced some significant deterioration.

著录项

  • 来源
    《Roads & bridges》 |2021年第9期|56-57|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号