首页> 外文期刊>Australian journal of water resources >Science and policy delay leading to loss of natural capital: case study of Te Waihora/Lake Ellesmere
【24h】

Science and policy delay leading to loss of natural capital: case study of Te Waihora/Lake Ellesmere

机译:Science and policy delay leading to loss of natural capital: case study of Te Waihora/Lake Ellesmere

获取原文
获取原文并翻译 | 示例
           

摘要

ABSTRACT The paper analyses sources of delay in developing environmental interventions to address overallocation of groundwater and water quality degradation for Te Waihora/Lake Ellesmere, a coastal lake in the Canterbury Region of New Zealand. The analysis highlighted the length of time required to collect the science to understand an issue and to formulate and implement policy responses. It also identified delays due to scientific uncertainty, scientific controversies, disregarding science, decision processes, and the response time of the natural system. The absence of clear policy approaches and environmental outcomes in order to implement environmental legislation was a significant source of delay. Delays in implementing environmental interventions led to loss of natural capital with groundwater overallocation reducing flows in groundwater-fed streams and freshwater inflows to the lake, and land use intensification degrading groundwater, groundwater-fed streams, and lake water quality. The extent of development beyond sustainable limits during these delays may have permanently compromised the ability to implement comprehensive environmental interventions.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号