首页> 外文期刊>PetroChemical News >Tellurian Begins Construction on Phase 1 Of Driftwood LNG Project in Louisiana
【24h】

Tellurian Begins Construction on Phase 1 Of Driftwood LNG Project in Louisiana

机译:Tellurian Begins Construction on Phase 1 Of Driftwood LNG Project in Louisiana

获取原文
获取原文并翻译 | 示例
           

摘要

Houston-Tellurian has issued a limited notice to proceed to Bechtel Energy,under an engineering,procurement and construction contract,to start construction of phase one of the Driftwood liquefied natural gas(LNG)terminal export facility near Lake Charles,La.(PCN,8 Apr 2019,p 4).Driftwood LNG,a subsidiary of Tellurian,will include two LNG plants with an export capacity of up to 11-million t/y in the first phase,and around 27.6-million t/y at full capacity.In 2019,Total and Tellurian signed a heads of agreement in which Total would make a $500-million equity investment in Driftwood LNG and purchase 1-million t/y of LNG from the project.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号