首页> 外文期刊>The Northern Miner. >Sabina greenlights Goose mine build
【24h】

Sabina greenlights Goose mine build

机译:Sabina greenlights Goose mine build

获取原文
获取原文并翻译 | 示例
           

摘要

Sabina Gold & Silver (TSX: SBB; US-OTC: SGSVF) has formally committed to building its $610-million Goose gold mine in Nunavut, which it acquired in 2009 and has been advancing ever since. Construction at the site, located in the Back River gold district about 400 km south of Cambridge Bay in western Nunavut is planned to start in 2023, with first gold production expected in 2025.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号