首页> 外文期刊>PetroChemical News >Wolf Carbon to Construct Pipeline for ADM To Transport.Store CQ2 from Iowa Plants
【24h】

Wolf Carbon to Construct Pipeline for ADM To Transport.Store CQ2 from Iowa Plants

机译:Wolf Carbon to Construct Pipeline for ADM To Transport.Store CQ2 from Iowa Plants

获取原文
获取原文并翻译 | 示例
           

摘要

Decatur- Wolf Carbon Solutions and ADM have signed a letter of intent,in which Wolf Solutions would build,own and operate a pipeline that would transport and store carbon dioxide produced at ADM's Clinton and Cedar Rapids,Iowa,facilities.The 350-mile line will be capable of transporting 12-million"t/y of CO2 from ADM's ethanol and cogeneration plants in Iowa to be stored permanently underground at its fully permitted and already-operational sequestration site in Decatur,111.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号