Prioritizing collaborative scheduling practices based on their impact on project performance

机译:Prioritizing collaborative scheduling practices based on their impact on project performance

获取原文
获取原文并翻译 | 示例
           

摘要

Collaborative scheduling (CS) and related practices impact the performance of construction projects which can be measured by key performance indicators (KPIs). However, little is known about which of these practices are implemented and how their combined implementation might impact KPIs. The objectives of this research are to identify perceptions of CS practices that drive project performance, define CS practices used by industry that impact KPIs, and establish practices that are more commonly implemented and have a higher potential to positively impact KPIs. The research team conducted a nationwide survey in the United States and obtained 241 usable responses. Utilizing an information theory approach to measure the uncertainty of implementation and impact of each practice, the research built a set of Chow-Liu tree models to determine the most efficient sequence of actions to improve CS. Results indicate that meeting owners' expectation throughout the life-cycle of the project from design through construction and commissioning, using the schedule to support a strong project culture, and an effective communication plan were the top CS levers for overall KPI improvement. An innovative method was developed to help construction project managers discover the value of each CS practice, the relation between CS practices, and CS practices' influence to project KPIs so that managers can improve KPIs efficiently by prioritizing their CS practices according to their own project needs.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号