...
首页> 外文期刊>Journal of hydroinformatics >Energy production assessment in a complex hydropower development
【24h】

Energy production assessment in a complex hydropower development

机译:Energy production assessment in a complex hydropower development

获取原文
获取原文并翻译 | 示例
           

摘要

A complex multi-reservoir hydropower development (HPD) was studied from the point of view of energy production. The Galceag HPD system consists of three reservoirs, a high head hydropower plant (HPP) powered by two Francis turbines of 75 MW each, and a pumping station (PS) equipped with two centrifugal pumps of 10 MW each. The hydraulic system configuration is unusual: the PS discharge pipe conveys the water directly into HPP's penstock. Three operation scenarios were investigated: ① normal operation (with PS shutdown and HPP operational, as a conventional HPP), ② simultaneous operation (with both HPP and PS operational), and ③ pumped storage (with HPP shutdown and PS operational). Primarily, a numerical model was set up in EPANET to investigate the influence that the variation in the initial level of the HPP upstream reservoir has on the production of energy. In the sequel, a numerical model was derived and solved in GNU Octave to investigate the influence on the energy production of HPD due to initial levels of both the HPP upstream and downstream reservoirs. The results can be used in a decision support system to assess the overall operation of Galceag HPD based on water availability.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号