...
首页> 外文期刊>Computer Methods in Applied Mechanics and Engineering >Balancing domain decomposition method for large-scale analysis of an assembly structure having millions of multipoint constraints
【24h】

Balancing domain decomposition method for large-scale analysis of an assembly structure having millions of multipoint constraints

机译:Balancing domain decomposition method for large-scale analysis of an assembly structure having millions of multipoint constraints

获取原文
获取原文并翻译 | 示例
           

摘要

? 2022 Elsevier B.V.A method by which to incorporate multipoint constraints (MPCs) into the balancing domain decomposition (BDD) method proposed in a previous study (BDD-MPC method) is investigated, improved, and applied to realistic and complex problems. First, the effects of the penalty term to take into account the MPCs in the coarse-grid problem of the BDD method are investigated. Then, improved implementation techniques for the BDD-MPC method are proposed. The computation speed of the projection procedure in the conjugate projected gradient method is improved using the block diagonal structure of the constraint matrix. The parallel solution procedure for the coarse-grid problem considering the MPCs that are projected to the coarse space is also improved. The improved MPC-BDD method is implemented in ADVENTURE_Solid, which is a parallel finite element structural analysis code. The code is parallelized using an MPI-OpenMP hybrid parallel implementation framework. In the previous study, the BDD-MPC method was applied to only simple numerical examples. In the present study the performance of the improved method is demonstrated by solving super-high-rise building models having very complex geometry and several million MPCs.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号