Based on the detailed engineering design of Dasu hydropower project and feasibility studies for Patan and Thakot-I in Pakistan, this paper assesses the impact of the Diamer Basha dam on reservoir sedimentation flushing and mean annual energy generation of the schemes. Two scenarios, with and without the dam, are explored. Establishing a coordination and monitoring centre in Laos C. Boungnong1, L. Laspho1,L Dinamivong1,S. Trossat2, B. Graff2; 1Ministry of Energy and Mines, Lao PDR;2CNR, France; On behalf of the Government of Laos and with funding from Agence Francaise de Developpement, CNR has been conducting a feasibility study for the past two years to establish a coordination monitoring centre (CMC) in Laos. The overall objective of the CMC is to set up a state-run agency dedicated to the coordination and monitoring of the management of all hydropower projects implemented in the country and featuring an installed capacity higher than 15 MW.
展开▼