...
首页> 外文期刊>International journal on hydropower & dams >Consent granted for a 200 MW pumped-storage plant in Gran Canaria
【24h】

Consent granted for a 200 MW pumped-storage plant in Gran Canaria

机译:Consent granted for a 200 MW pumped-storage plant in Gran Canaria

获取原文
获取原文并翻译 | 示例
           

摘要

Spain's grid operator Red Electrica de Espana (REE) plans to begin construction of the 200 MW (3.2 GWh/year) Salto de Chira pumped-storage plant on the island of Gran Canaria, after being granted consent by the Canary Islands' Ministry of Environment. The General Directorate of Energy of the Ministry of Ecological Transition, Fight against Climate Change and Territorial Planning of the Government of the Canary Islands issued the administrative authorization for the project in mid-December, which allows the first major energy storage project in the Canary Islands to move ahead. This follows a declaration of common interest for the project on 25 November by the Government of the Canary Islands and of a decree for the implementation of the scheme.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号