首页> 外文期刊>engenharia agricola >SOFTWARE FOR CALCULATION OF RESERVOIR ACTIVE CAPACITY WITH THE SEQUENT-PEAK ALGORITHM
【24h】

SOFTWARE FOR CALCULATION OF RESERVOIR ACTIVE CAPACITY WITH THE SEQUENT-PEAK ALGORITHM

机译:SOFTWARE FOR CALCULATION OF RESERVOIR ACTIVE CAPACITY WITH THE SEQUENT-PEAK ALGORITHM

获取原文
获取原文并翻译 | 示例
           

摘要

abstract_textpIt is presented a software developed with Delphi programming language to compute the reservoir's annual regulated active storage, based on the sequent-peak algorithm. Mathematical models used for that purpose generally require extended hydrological series. Usually, the analysis of those series is performed with spreadsheets or graphical representations. Based on that, it was developed a software for calculation of reservoir active capacity. An example calculation is shown by 30-years (from 1977 to 2009) monthly mean flow historical data, from Corrente River, located at Sao Francisco River Basin, Brazil. As an additional tool, an interface was developed to manage water resources, helping to manipulate data and to point out information that it would be of interest to the user. Moreover, with that interface irrigation districts where water consumption is higher can be analyzed as a function of specific seasonal water demands situations. From a practical application, it is possible to conclude that the program provides the calculation originally proposed. It was designed to keep information organized and retrievable at any time, and to show simulation on seasonal water demands throughout the year, contributing with the elements of study concerning reservoir projects. This program, with its functionality, is an important tool for decision making in the water resources management./p/abstract_text

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号