ABSTRACTSignificant savings are frequently achieved from increasing well and pump efficiency by repair or replacement. Replacement analysis (a part of engineering economics) may be used to schedule these actions. The criterion is to maximize net benefits or minimize the cost of water. The optimal timing of repair or replacement occurs when the cost per unit of water from the old system becomes more than the minimum annualized cost per unit of water from the new system.
展开▼