首页> 外文期刊>Power engineer >Design options for new nuclear plants
【24h】

Design options for new nuclear plants

机译:Design options for new nuclear plants

获取原文
获取原文并翻译 | 示例
           

摘要

Both the AP series and the PBMR embody the technologies necessary to meet the needs of nuclear utility customers in the short term and out into the future. If the political, policy and regulatory frameworks can be rectified to make investment in nuclear power viable, where this is not already the case, then the industry may be able to play its key role in achieving the elusive 'win-win' outcome to the energy policy challenge.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号