...
首页> 外文期刊>Canadian water resources journal >A REVIEW OF THE SOCIO-ECONOMIC EVALUATION OF THE CHURCHILL RIVER DEVELOPMENT PROPOSAL
【24h】

A REVIEW OF THE SOCIO-ECONOMIC EVALUATION OF THE CHURCHILL RIVER DEVELOPMENT PROPOSAL

机译:A REVIEW OF THE SOCIO-ECONOMIC EVALUATION OF THE CHURCHILL RIVER DEVELOPMENT PROPOSAL

获取原文
           

摘要

This paper is a summary of the socio-economic assessment of the Saskatchewan Power Corporation proposal to develop a hydro electric generating facility at the Wintego Fall site on the Churchill River. The results of a direct cost-benefit analysis conducted in the context of different rates of growth in energy demand, different petroleum prices, different rates of substitution between petroleum and electricity, and various real discount rates, are presented. In addition, indirect measurable costs and benefits are estimated and non-measurable indirect effects are evaluated through a type of sensitivity analysis. The potential social impacts are also summarized.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号