The 300-kW Buckley Hydro project is situated at elevation 8,700 feet on Clear Creek in Georgetown, Colorado. A unique feature of the project is a siphon penstock, which carries water from the reservoir, across an embankment dam, and 1,300 feet downhill to the powerhouse. In trying to solve a vacuum problem during operation of the penstock that had shut down the power station, the owners discovered a $30 fix that might be helpful to other hydro projects with similar penstock configurations.

著录项

  • 来源
    《Hydro review》 |2003年第1期|58-59|共2页
  • 作者

    Eric R. Jacobson;

  • 作者单位

    Lake George Hydro, LLC, Western Colorado Power Co., Bridal Veil Powerstation, P.O. Box 745, Telluride, CO 81435;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 发电、发电厂;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号