...
首页> 外文期刊>Japanese railway engineering >Linear Motor Car Line Construction Greatly Forward - Publicize the Environment Assessment Prepared Statement
【24h】

Linear Motor Car Line Construction Greatly Forward - Publicize the Environment Assessment Prepared Statement

机译:Linear Motor Car Line Construction Greatly Forward - Publicize the Environment Assessment Prepared Statement

获取原文
获取原文并翻译 | 示例
           

摘要

On 18 September 2013, JR Central published environmental impact assessment prepared statement for the linear central Shinkansen planning between Tokyo Shinagawa and Nagoya, aim to open in FY 2027. In addition to showing the route of 286km length of which about 86 is tunnels and the detailed location of stations and car maintenance depots, research results of environmental assessment, which carried out so far, were opened. By details revealed, the plan will be a major step forward towards the start of construction in 2014.

著录项

  • 来源
    《Japanese railway engineering》 |2014年第182期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号