首页> 外文期刊>Proceedings of the Institution of Civil Engineers. Municipal engineer >The development and construction of offshore cooling water culverts for South Humber Bank Power Station
【24h】

The development and construction of offshore cooling water culverts for South Humber Bank Power Station

机译:The development and construction of offshore cooling water culverts for South Humber Bank Power Station

获取原文
获取原文并翻译 | 示例
           

摘要

Reinforced concrete culverts for South Humber Bank's intake andoutfall cooling Water culverts were precast at a site in ImminghamDocks. Seventy-four 600 t Units 45·65 m long × 5·98 m wide ×3·60m high were cast on a prepared bed, lifted and transported on modulartrailers to barges for towing to the con- struction site. A speciallyfabricated frame, suspended from two shearleg barges, lifted theunits from the transport barge and lowered them into the water. Inthe fore- shore area where site of special scientific interest (SSSI)restrictions applied, the units were floated into a wet cofferdambefore being lowered onto a prepared bed by winches supported on thecofferdam frames.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号