...
首页> 外文期刊>Canadian water resources journal >The Engineering Background to the Oldman River Dam and Reservoir
【24h】

The Engineering Background to the Oldman River Dam and Reservoir

机译:The Engineering Background to the Oldman River Dam and Reservoir

获取原文
           

摘要

The Government of Alberta announced in August, 1984 that a dam and reservoir would be constructed on the Oldman River, about 10 kilometres northeast of the Town of Pincher Creek. This announcement culminated years of study dating back to the early 1960s and triggered a seven-year program of exploration, design, and construction that will see the project complete and storing water by 1991.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号